Customization: | Available |
---|---|
Type: | Chemical Hardening Sand |
Casting Method: | Mechanical Aided Pouring& Semi-Automatic Pouring |
Still deciding? Get samples of US$ 1.7/kg
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
|
1. Marterial percentage | alloy steel:45% carbon steel:35% stainless steel:10% iron:10% |
2. Casting weight percentage | 0.1-5kg:40% 5-20kg:30% 20-40kg:20% above 40kg:10% |
3. Industry percentage | Components for train & railway: 25% Components for automobile & truck: 30% Components for construction machinery & forklift: 25% Components for agricultural machinery: 10% Other machinery compponents: 10% |
4. Globa market share | United States:30% Europe:35% Japan& Korea:15% Domestic market:15% Other:5% |
5. Production capacity | Production Capacity: 20,000 tons / year The Current Production Output: 15,000 tons / year Open Capacity Percentage: 25% |
APQP-Casting 1. Process Flow Diagrams 2. Control Plan 3. Process FMEA 4. Casting Process Instruction 5. Solidification Simulation Report 6. Heat Treatment Work Instruction 7. Casting Final Quality Control WI 8. Visual Inspection VI For Surface Irregularities |
Inspection Report-Casting 1. Material Test Report(A) 2. Material Test Report(B) 3. Magnetic Particle Inspection Report 4. Ultrasonic Examination Report 5. Radiographic Test Report 6. Destructive Test Report 7. Coating Test Report 8. Visual Inspection Report 9. Casting Inspection Report |
APQP-Machining 1. Process Flow Diagrams 2. Control Plan 3. Process FMEA 4. Machining Process Instruction 5. Gauge List And Validation Plan 6. Final Quality Control |
Other Quality Document 1. PPAP Checklist 2.Measurement System Analysis Study 3. Process Capability Studies 4. Corrective Action Report(8D) 5. Packaging Instruction |
Inspection Report-Machining
1. Dimensional Inspection Report(A)
2. Dimensional Inspection Report(B)
3. CMM Report
|
Application
|
|||||
• Agricultural equipment
|
• Armament
|
• Automobile industry
|
• Computing equipment
|
• Medical / dental instruments
|
• Measuring instruments
|
•Miscellaneous equipment
|
•Pharmaceutical industry
|
• Orthopedic implants
|
• Safety equipment
|
• Petrochemical industry
|
• Industrial valves
|
•Fixing and movable equipment
|
• Sanitary fittings
|
• General machinery
|
• Pumps and general connections
|
• Food and beverage processing
|
• Instrumentation equipment
|
Our Company